Company’s experience in design works
N |
Financing |
Name of contract |
Client |
Nature of service |
|
RA Ministry of Finance |
Preparation of Design and Cost Estimate Documents for State Needs |
State Committee of Water System |
Design works |
|
|
Preparation of Design and Cost Estimate Documents for Anti-Seepage Measures of Sevaberd Reservoir in RA Kotayk Marz |
|
|
Technical Specification for Preparation of Design and Cost Estimate Documents for Rehabilitation of Zone IV of Armash Pump Station and Provision of Expert Conclusion |
||||
Technical Specification for Preparation of Design and Cost Estimate Documents for Rehabilitation of Zone III of Surenavan Village Pipeline Rehabilitation and Provision of Expert Conclusion |
||||
Technical Specification for Preparation of Design and Cost Estimate Documents for Rehabilitation of Deep Wells under the Project “2018 Rehabilitation of Irrigation Systems” and Provision of Expert Conclusion |
||||
Preparation of Design and Cost Estimate Documents for Anti-Seepage Measures of Sarnaghbyur Reservoir in RA Shirak Marz and Provision of Expert Conclusion |
||||
|
French Development Agency (AFD) |
Detailed Design for Rehabilitation of On-Farm Irrigation Network under “Construction of Vedi Dam and Irrigation System” Project |
“Water Sector PIU” SA |
Design works and author’s supervision |
|
KfW Development Bank |
Integrated Water Resource Management / Akhouryan River: Feasibility Study and Detailed Design of the Construction of Kaps Reservoir and Gravity Irrigation System
|
“Water Sector PIU” SA |
Preparation of detailed design and bidding documents |
|
French Development Agency (AFD) |
Detailed Design for Construction of Vedi Reservoir 11 km Approach Pipeline |
“Water Sector PIU” SA |
Detailed design |
|
RA Government |
Detailed Design for Construction of Eight Gravity Irrigation Schemes under Irrigation System Modernization Project |
“Water Sector PIU” SA |
Design works |
1) Auxiliary Canal from Azat River to Mkhchyan p/s 1st Stage Outlet Canal |
||||
2) Bardzruni Gravity Irrigation Scheme |
||||
3) Tsitsernakaberd Gravity Irrigation Scheme |
||||
4) Argichi Gravity Irrigation Scheme |
||||
5) Gravity Irrigation Scheme from 5th Distributor Canal of Artshat Canal |
||||
6) Gravity Irrigation Scheme of Nor Geghi and Artamet Communities |
||||
7) Gravity Irrigation Scheme of Nor Kharberd Community from Nork Canal |
||||
8) Ptghni Gravity Irrigation Scheme |
||||
|
RA Government |
Feasibility Study, Preliminary Design and Preparation of Project Documents for Mastara Reservoir Construction Project |
“Water Sector PIU” SA |
Feasibility study, preparation of preliminary design and project documents |
|
Eurasian Development Bank (EDB) |
Geodetic works for Gyumri Bypass Section of North-South Road |
“Artshakroad” CJSC |
Geodetic survey and detailed design |
|
Government of Japan (JICA) |
Geodetic Works, Assessment of Technical Condition and Design Improvement Works for Yeghvard Irrigation System Improvement Project
|
Sanyu Consultants Inc. |
Feasibility study and geodetic survey and design works |
|
RA Government |
Design for Rehabilitation of 5 High Schools |
Ministry of Education and Science PIU |
Design works |
|
“Yerevan State Pedagogical University after Kh. Abovyan” SNCO |
Assessment of Infrastructure Needs and Preparation of Terms of Reference for Rehabilitation of N 57 Main School |
“Yerevan State Pedagogical University after Kh. Abovyan” SNCO |
Assessment and preparation of ToR |